Deerfoot City

Project Info

  • Project Date

    2017 (Phase 1) Q4 2017 (Phase II)

  • Category

    Retail, Current Projects

  • Owner

    Shape Propertie

  • Architect

    Gibbs Gage Architects (Phase 1), Dialog (Phase 2)

  • General Contractor

    Ledcor Construction

Description


This retail project is strategically located in the NE quadrant of Calgary at the Deerfoot Trail (HWY 2) and 64th Avenue NE interchange. Redevelopment plans include converting the current enclosed mall to an open air regional shopping centre. A diverse assortment of shops, restaurants, and conveniences will be purposefully positioned creating natural social zones and a unique street scape setting which will create a totally new shopping experience in Calgary.
Phase I (which has been completed), consists of buildings A, B, & C, and includes a Dollarama and Goodlife Fitness centre inside the existing mall, and twenty three other commercial retail units. Phase II (underway) includes more than 100 commercial retail units In both Phases I and II, m+b is responsible for the base building electrical systems designs which includes the Enmax pad mounted transformers, power distribution, fire alarm, emergency lighting, base building lighting, lighting control system, a low voltage system and communications rough-ins, metering systems tenant outline drawings and contract administration. m+b also designed all new electrical rooms and performed all verification’s of the fire alarm system for the base building and tenant works.